Week 1 - Improvement of the project.

    For the first week of Final Year Project 2 (FYP 2) progression, I reviewed the comments given by the assessors on my project during the project presentation of Final Year Project 1. The comments are supposed to help improve the project.

    The improvement to be made is the addition of a relay into the circuit. Relays are the switches that aim at closing and opening the circuits electronically as well as electromechanically. It controls the opening and closing of the circuit contacts of an electronic circuit. The relay is used to control the opening and closing of the solenoid door lock. Also, 3 double A batteries with a total of 12v are used to supply power to the solenoid door lock.

    The second improvement to be made is for the GSM to be having two-way communication with the user. Currently, the GSM only function to send alert notification to the user if an unauthorized person is trying to enter the door. So for the improvement, the GSM will send and receive commands from the user the lock and unlock the door. 

Comments

Popular posts from this blog

Week 11 - Designing and assembling the door for the project.

Week 16 - FYP Slides and Presentation Preparation.